我厂生产的12V 240柴油机用凸轮轴,材质为45钢,中部有一个φ30毫米的油道孔。每根凸轮轴由四段轴组成,其中最长的一段为1450毫米。过去用接杆钻头钻孔,手动进刀,需经常退屑,不断浇冷却液,不仅劳动强度大,而且生产效率低,钻一根需要两个班的时间。为了解决这一关键,我厂机一车间组成了以工人为主体的三结合攻关组,
I plant the production of 12V 240 diesel camshafts, made of 45 steel, the middle of a φ30 mm of the oil hole. Each camshaft consists of four shafts, the longest of which is 1450 mm. In the past with the rod drill bit drilling, manual feed, often need to remove debris, keep pouring coolant, not only labor-intensive, and low productivity, drilling a need two classes of time. In order to solve this key, I plant a workshop composed of workers as the main three key research groups,