上馬嶺水电立占工程是全国大跃进形势下提前施工的一个,工期造价均較原計划縮减一半,因之任务非常艰巨。电站的引水隧洞全長达7.650公尺,是我国目前施工中最
The Shangmaling Hydropower Project occupies one of the advanced construction under the Great Leap Forward situation throughout the country. The construction cost of the project is reduced by half compared with the original plan. The task is very arduous. The total length of the diversion tunnel of the power station is 7.650 meters, which is the most construction in our country at present