在水电站的规划和设计工作中,经常会由于某些原因,要求在设计的水电站上预留出机组空位,以便远景开发时增装机组。但是在不同型式的水电站上预留机组空位所需进行的水工、土建工程项目是不同的,相应的投资费用也要随之而异。例如在坝后式水电站上预留机组空位时,只需提前完成进水建筑物和厂房中一部分的土建工程,预留机组空位积压投资不大,
In the planning and design work of hydropower stations, it is often required for some reasons that a crew space be reserved on the designed hydropower station so that units can be retrofitted during long-term development. However, the hydraulic and civil engineering projects required for reserving crew space on different types of hydropower stations are different, and the corresponding investment costs also vary. For example, when reserving a crew space on a post-dam type hydropower station, only civil works in part of the inflow buildings and factories must be completed ahead of schedule, and it is not necessary to reserve a large amount of vacancies for the crew.