论文部分内容阅读
本文叙述了安肇新河各涵闸投入运行后普遍漏水,管理部门配合施工单位采取有效措施使其运行达到设计标准。
This article narrates the leakage of all culvert gates in An Zhao New River after it is put into operation, and the management department cooperates with the construction unit to take effective measures to make it run up to the design standards.