论文部分内容阅读
由杭州机械设计研究所设计、郑州水工机械厂制造的我国第一座带二次筛分的预冷砼搅拌楼,经过水电八局的安装和使用,证实了其设计、工艺是先进可靠的,性能符合设计要求,生产效率能够满足大型水电工程砼的生产需要,为五强溪水电站第一台机组提前发电打下了良好的基础。现该楼已完成五强溪工程的砼生产任务,正被拆转到下游的凌泮滩工地使用。
Designed by Hangzhou Mechanical Design Institute, the first pre-cooling concrete mixing plant with secondary screening manufactured by Zhengzhou Hydraulic Machinery Factory was confirmed by the installation and use of the hydropower bureau, confirming the advanced and reliable process , Performance meets the design requirements, production efficiency to meet the production needs of large-scale hydropower project of concrete, the first unit of Wuqiangxi Hydropower Station laid a good foundation in advance. Now the floor has been completed Wuqiang River project of concrete production tasks, is being demolished to the downstream Ling Pan Phang site use.