施工工艺改变影响工程变更的依据和要件

来源 :建筑 | 被引量 : 0次 | 上传用户:gjj19901005
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
工程变更是指在合同履行过程中,因工程设计文件或施工技术规范的修改等因素而引起的合同变更。在水利水电工程中,按照现行《水利水电工程施工合同和招标文件示范文本》的划分,变更包括以下七个方面:①增加或减少合同中任何一项工作内容;②增加或减少合同中关键项目的工程量超过专用合同条款规定的百分比;③取消合同中任何一项工作(但被取消的工作不能转由发包人或其他承包人实施);④改变合同中任何一项工作的 Project change refers to the change of contract caused by factors such as engineering design documents or modification of construction technical specifications during the performance of the contract. In the water conservancy and hydropower project, in accordance with the current “water conservancy and hydropower project construction contract and bidding documents model,” the division, changes include the following seven aspects: ① increase or decrease any one of the contents of the contract; ② increase or decrease the contract key projects Of the project exceeds the percentage specified in the terms of the contract; ③ cancel any one of the work contract (but the canceled work can not be transferred to the outsourcer or other contractors); ④ change any of the contract work
其他文献
该文对于中国大学英语学生学习英语词汇的方法进行调查,其目的是研究这些学生使 用诩汇学习策略的总体情况及特点、好学生和差学生在这些策略使用中是否存在差异以及学习策略
主办:北京市建筑设计研究院有限公司(BIAD)、BIAD第三建筑设计院、BIAD规演和会展建筑研究中心、国家大剧院承办:《建筑技艺》杂志社协办:北京宝贵石艺科技有限公司、浙江大
期刊
请下载后查看,本文暂不支持在线获取查看简介。 Please download to view, this article does not support online access to view profile.
进度控制是指在限定的工期内,以事先拟定的合理且经济的工程进度计划为依据,对整个建设过程进行监督、检查、指导和纠正的行为过程。为了对施工项目实行进度计划控制,首先必
期刊
天津某四合院建于民国初期,进入大门便是内门的门楼亭子,两旁围墙高4 m,前厅内院两边是三开间厢房,迎面是南北朝向五开间,中央为厅堂,后面的内院重复前院的组合,前后院外侧夹
期刊
北京十三陵水库位于北京昌平区境内,在十三陵盆地的东南,距北京城区40km。该水库于1958年初开始修建,边勘察、边设计、边准备、边施工,于当年6月30日建成。水库面积是颐和园
《西游记》是他阅读的第一部小说周恩来出生于书香世家。周家祖祖辈辈均是走读书,考秀才、考举人、做官这一仕途之路的。按周家祖训,男孩子五岁就得进家塾馆读书,写字均是习
新课程背景下,生成性课堂成为了物理课堂组织的一种重要形式,生成性课堂是真实的、自然的师生互动课堂,是静态“预设”与动态“生成”和谐统一的过程,本文就生成性课堂教学如