CPC公司选用了设计 -建造方式 ,中间增加重要的“合格 -不合格”评估阶段。提出了获胜的投资为 2 .2亿加元的设计方案 ,还为业主省出 0 .2 5亿加元 ,用于建一条输电线路
CPC selected the design-build approach, adding an important “pass-fail” evaluation phase. Proposed a winning design of 2.2 billion Canadian dollars, but also for owners to save 0.25 billion Canadian dollars for the construction of a transmission line