论文部分内容阅读
自动废石车是用来丢弃选矿厂粗选工段的大块废石的。一年多的生产表明,它的性能良好,运行可靠,实现了废石运卸自动化,每天可节约劳动力6个,同时保障了废石的及时排出,消除了过去因废石运输而影响生产的问题。这是我矿选矿厂广大工人自力更生大搞技术革新所取得的成果之一。自动废石车的结构原理如图1所示,它由单弓架给电2.8瓩直流电动机,再由直流电机传动变速箱,经中间齿轮,使废石车以1米/分的速度在轨道上运行。当废石车装满废石运行至倒矿端时,车上开关把手碰复位曲轨下部而被迫打开,使车斗翻转倒矿,经过6~8秒钟延
Automatic waste rock car is used to discard the large section of the ore dressing plant waste rock. More than a year of production shows that its performance is good, reliable operation, automated waste rock handling and labor saving 6 per day, while ensuring the timely discharge of waste rock, eliminating the past because of waste rock transportation and the impact of production problem. This is one of the achievements made by the vast number of workers in our ore dressing plant for self-reliance and technological innovation. The structure principle of automatic waste rock car is shown as in Fig. 1, it is powered by a single bow frame 2.8 瓩 DC motor, and then by the DC motor transmission gearbox, the intermediate gear, the waste rock car at 1 m / min speed in the track On the run. When the waste rock car is full of waste rock run to the end of dumping, the car switch touch the lower part of the track to be forced to open the turn, turn the bucket inverted mine, after 6 to 8 seconds delay