论文部分内容阅读
黄河小浪底水利枢纽位于三门峡水库下游132km。枢纽的开发任务以防洪(包括防凌)、减淤为主,兼顾供水、灌溉、发电、除害兴利、综合利用。水库的总库容为126.5×10~8m~3,主要建筑物有:拦河斜心墙土石坝一座,最大坝高173m;泄洪洞6条,内径14.5m;排沙洞3条,内径6.5m;电站一座,装机6台,156万千瓦。 中国国际工程咨询公司邀请国内专家、教授共四十余人,以及有关地区、部门代表二十余人,对该工程的设计任务书进行了评估。五月中旬召开了第一次工作会议。会后,专家组分为综合规
The Yellow River Xiaolangdi Water Control Project is located 132km downstream of Sanmenxia Reservoir. The task of developing the hub is to prevent flooding (including anti-flooding) and to reduce siltation, taking into account water supply, irrigation, power generation, detrimental benefits and comprehensive utilization. The total storage capacity of the reservoir is 126.5 × 10 ~ 8m ~ 3. The main buildings are: a dambed inclined earth-rock dam with a maximum dam height of 173m; 6 spillway tunnels with an inner diameter of 14.5m; 3 sediment discharge tunnels with an inner diameter of 6.5m ; A power station, installed 6 units, 1.56 million kilowatts. China International Engineering Consulting Corporation invited a total of more than 40 domestic experts and professors and more than 20 representatives from relevant regions and departments to evaluate the design task of the project. The first working meeting was held in mid-May. After the meeting, the expert group is divided into comprehensive regulations