论文部分内容阅读
2012年12月31日,交通运输部发布《关于开展长途客运接驳运输试点工作的通知》,13省市的长途客运接驳运输试点工作就此拉开序幕,截至2013年7月,已有36个企业、783条线路、1818台车、387个接驳点正式开展运作。接驳运输并非新名词。但是,它却在这样一个特殊的时期新意凸显,被赋予长途客运企业保障安全营运和科学发展的重大意义,被赋予长途客运线路集约化、公司化改造的重大内蕴,被赋予转型升级难得机遇的重大期待,接驳点雨后
On December 31, 2012, the Ministry of Transport issued the “Notice on Pilot Project of Connecting and Transporting Long-distance Passenger Transport”. As a result, pilot transport of long-distance passenger transport in 13 provinces and municipalities was kicked off. As of July 2013, 36 A business, 783 lines, 1818 trolley, 387 connection point formally operate. Shuttle transport is not a new term. However, it has highlighted the new ideas in such a special period. It is endowed with great significance to the long-distance passenger transport enterprises in ensuring safe operation and scientific development. It has been entrusted with the major connotation of intensive and corporatized reconstruction of long-distance passenger transport lines and is given a rare opportunity of transformation and upgrading The big look forward to the connection point after the rain