论文部分内容阅读
风电中国,一路狂飙猛进。据中电联2012年度全国电力工业年度统计快报披露,2012年底风电装机容量已达6083万千瓦,全年发电量1004亿千瓦时,均居世界第一。年新增装机超过1400万千瓦,连续五年位居全球第一。中国风电,问题日渐突出。据国家能源局发布数据显示,2012年全国风电平均利用小时1890小时,比2011年的1920小时减少了30小时。蒙东、吉林限电问题最为突出,冬季供暖期限电比例已经超过50%。蒙西、甘肃酒泉、张家口坝上地区电网运行限电比例达20%以上,黑龙江、辽宁风电运行限电比例达到10%以上。弃风限电由来已久。自2008年以来,内蒙古风电企业“窝电”现象频现。2011年,全国21个省级电网相继出
Wind power China, all the way to soar. According to the 2012 annual report of China Power Industry Statistical Bulletin released by CEC, the installed capacity of wind power reached 60.83 million kilowatts by the end of 2012, generating 100.4 billion kilowatt-hours of electricity a year, ranking first in the world. New installed capacity of more than 14 million kilowatts, ranking first in the world for five consecutive years. China’s wind power, the problem has become increasingly prominent. According to data released by the National Energy Administration show that in 2012 the national average utilization of wind power 1890 hours, compared with 1920 hours in 2011 reduced by 30 hours. Mengdong, Jilin power cut the most prominent problem, the winter heating period electricity ratio has more than 50%. Mengxi, Jiuquan, Gansu, Zhangjiakou Bashang area power grid operation limit the proportion of more than 20%, Heilongjiang, Liaoning wind power operation limit the proportion of more than 10%. Wind curtailment has a long history. Since 2008, Inner Mongolia wind power enterprises “nesting ” phenomenon is frequent. In 2011, 21 provincial power grids nationwide came out one by one