论文部分内容阅读
在火电厂主厂房框架的施工中 ,为了使混凝土外观有很大的提高 ,模板是一个很重要的环节。盘山电厂二期主厂房框架的施工 ,通过工艺和经济的综合比较 ,柱使用定型组合钢模板 ,梁使用木制大模板 ,板使用废旧钢模板衬竹胶合板组成大模板。经实践证明 ,这是比较适合现在火电厂主厂房框架施工的模板工艺 ,它可以在火电厂施工中推广应用。
In the construction of the frame of the main powerhouse of a thermal power plant, the formwork is an important link in order to greatly improve the appearance of the concrete. In the construction of the main power house frame of Phase II of Panshan Power Plant, a comprehensive comparison of the process and economy is used. The column uses the fixed combination steel formwork, the beam uses the wooden large formwork, and the board uses the old steel formwork to pave the bamboo plywood to form the large formwork. It has been proved by practice that this is a formwork process that is more suitable for the frame construction of the main powerhouses of thermal power plants. It can be used in the construction of thermal power plants.