根据中华人民共和国环境保护法和港口环境规划及大连港海域污染的现状,提出防污建议如下: (一)装配码头、船舶溢油防污设备 1980年对新港油码头铺设围油栏进行总结,在取得经验的基础上,建议1981~1982年分别在寺儿沟、石油七厂油码头开展围油栏业务。以现有三个石油作业区四个码头八个泊位,总长1000米计算,需要固定式和浮沉式围油栏4500米,刷洗换用
According to the Environmental Protection Law of the People’s Republic of China and the port environment plan and the status quo of pollution in Dalian Harbor, suggestions on pollution prevention are put forward as follows: (I) Installation of Oil Spill and Anti-fouling Equipment for Wharf and Ships In 1980, On the basis of gaining experience, it is suggested that the oil booms should be carried out at the Tertiary Oil Terminal of Terenggi and Seventh Plants from 1981 to 1982 respectively. To the existing three oil operations area four quay eight berths, a total length of 1000 meters, the need for fixed and floating booms 4500 meters, scrubbing change