论文部分内容阅读
1955年我们学习贯彻了50多项苏联先进经验和专家建议,使得长期不能解决的重大生产技术问题得到了解决。例如炼钢车间学习推行了厚层烧补炉底苏联先进经验,使热修时间降到1954年的一半以下,并因热修时间缩短去年给国家增产1200吨钢;线材轧钢机由于贯彻了使用双槽围盘的专家建议,使盘条机时产量提高了10%以上,接近1956年的指标;中型轧钢机烘钢炉按专家建议改进了构造,使烘钢能力提高12%,解决了设备长期不平衡的问题(轧钢机能力大于烘钢炉能力)。去年我们贯彻和推广苏联先进经验和专家建议所以能够取得重大收效,是由于全体职工对向苏联学
In 1955, we studied and implemented more than 50 advanced Soviet experiences and expert advice, resolving major long-term unsolved problems in production technology. For example, in the steelmaking workshop, the advanced Soviet experience of thickening and burning furnaces was reduced to less than half of that in 1954, and 1,200 tons of steel were increased for the country last year due to the shortening of the heat repair time. As a result of the implementation of the wire rod rolling mill, Double slotted panel of experts suggest that the production of wire rod machine increased by 10% or more, close to the 1956 target; medium rolling mill oven steel according to expert advice to improve the structure, so that the drying capacity increased by 12%, to solve the equipment The problem of long-term imbalance (rolling mill capacity is greater than the drying furnace capacity). Last year we carried out and promoted the advanced experience and expert advice of the Soviet Union so that we can achieve significant results. This is because all our staff and workers are obliged to study in the Soviet Union