在党的总路线的照耀下前进一步——为庆祝一九五四年元旦而作

来源 :山西政报 | 被引量 : 0次 | 上传用户:placaptain
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
今天,我们满怀着信心跨进了祖国第一个五年计划的第二个年度——一九五四年。回顾一九五三年,许多令人观欣鼓舞的重大事件涌上了我们的心头。首先应当提到的是,朝鲜停战的实现。这是中朝人民的伟大胜利,也是世界一切爱好和平的国家和人民的伟大胜利。这个胜利,对于我们国家正在进行着的有计划的经济建设是极为有利的。「鞍山无缝钢管厂,鞍山大型轧钢厂和鞍山第七号炼铁炉的提前完成建设工程并开始生产,这是一九五三年重工业发展中的巨大事件。」(注一)这三大工程 Today, we are full of confidence into the second year of the first five-year plan of the motherland - 1954. In retrospect, in 1953, many inspiring events came to our hearts. The first thing that should be mentioned is the realization of a truce in North Korea. This is a great victory for the Chinese and Korean peoples as well as a great victory for all the peace-loving nations and peoples in the world. This victory is extremely beneficial to the ongoing planned economic construction in our country. “Anshan Seamless Steel Tube Plant, Anshan Large Rolling Mill and Anshan No.7 Iron Furnace completed their construction ahead of schedule and started production. This is a tremendous event in the development of heavy industry in 1953.” (Note 1) These three major engineering
其他文献
-、選民登記表的格式規定兩種,每種各有直寫和橫寫兩式。第一種的內容分姓名、性別、年齡、民族四欄。是供不需要填明選民住址的選舉區城或選舉單位用的。第二種的內容增列
大朝山水电站 1号、2号、3号泄洪排砂底孔弧形工作闸门单铰推力为 3 3× 10 4 kN ,闸室采用梁式预应力闸墩结构 ,弧门支臂传递的推力由支承大梁向边墩和中墩传递 ,从而减小
全体劳模代表同志们:我们这次会议听取了中共山西省委陶鲁笳同志的「山西省一九五二年国营、地方国营工业生产总结及一九五三年工作要点」报告,又集体收听了周总理在政协会
一年来,我省各地发生火灾事件很多,根据民政厅十个月的不完全统计:计有临川、丰城、崇仁、高安等二十四个县市共发生火灾一百七十八次,受灾群众三千七百四十八人,其中因火灾
(一)一九五一年幹部工作的任务一九五○年我們的幹部工作,随着整個建設工作的前進,會經有很大的收獲,一年來我們會大量的培養訓練提拔了幹部,以適应各種建設工作需要,我們曾
一个工厂、矿山的建设,必需经过勘察、设计、施工、安装、试运转等过程。现在在加强资源勘察工作、壮大设计、施工力量等方面已经开始引起了各个基本建设单位的注意,并且有
(一)教育方针和目的為適應形势及国家建設任務之需要,有步驟有系統的對幹部進行馬列主義毛澤東思想的教育,以提高斡部的政治思想水平與工作能大。要確实有效的貫澈這一方針,
主席、各位委员、各位同志:一、江西在第二次国内战争时期,包括半数以上的人口,三分之二以上的地区建立过人民政权和人民根据地(苏区),这是江西历史情况最突出的特点。 Cha
我國现有森林面積過小,水材資源貧乏,因之,既下能满足国家長期建設的需要,又不能庇護廣大土地,抵抗風沙水旱,致農业生產受到極大威脅。此種嚴重情况,亟須加以改變。三年多来
1.设立江河流域管理机构淮河的流域管理机构设置较早,1909年初名江苏水利公司,后几经易名,1929年1 月改设导淮委员会;1918年成立顺直水利委员会,负责黄河、海河的河政管理,19