随着国家节能环保要求的不断提高,以及火力发电厂直接空冷机组技术的不断成熟,可以节约大量水资源的空冷机组在火力发电厂被越来越多的采用,尤其在西部地区,水资源相对比较匮乏,直接空冷机组是今后的发展趋势。空冷支架柱,施工难度大、外观工艺质量要求高,作为电厂的标志性工程,施工质量控制尤为重要。现在以山西河曲鲁能发电厂二期2×600MW直接空冷机组为例进行阐述。
With the continuous improvement of national energy conservation and environmental protection requirements, as well as the continuous maturation of direct air-cooling unit technology in thermal power plants, air-cooled units that can save a lot of water resources are increasingly being adopted in thermal power plants. Especially in the western region, water resources are relatively More scarce, direct air-cooled unit is the future trend of development. Air-cooled stent column, construction difficulty, the appearance of high quality requirements of the process, as a landmark project of power plants, construction quality control is particularly important. At present, Shanxi Luliang Power Plant Phase II 2 × 600MW direct air-cooled unit as an example to elaborate.