论文部分内容阅读
柳钢棒材厂第二条棒材连轧生产线技改工程设计方案通过审定,现已正式与中国冶金设备总公司签定了设计与供货合同。该生产线总投资1.26亿元,主要生产
The second bar and rod rolling mill Liuzhou Iron and Steel Technology Co., Ltd. has passed the validation of technical transformation project design has been formally signed with the China Metallurgical Equipment Corporation design and supply contracts. The production line with a total investment of 126 million yuan, the main production