【摘 要】随着城市住宅建设步伐的加快,住户对住房的质量要求越来越高,现浇楼板的裂缝成了投诉热点,也是工程的重大隐患。 本文简要分析了现浇楼板裂缝的成因,并提出了防治措施。
【关键词】多层住宅;现浇楼板;裂缝;成因;防治
Shallow talk to sprinkle building plank crack now of become because of with prevention and cure
Zhang Zi-hua
(Fushun zhongyu construction(group) limited liability company Fushun Liaoning 113000)
【Abstract】Along with town house construction step of speed, the inhabitant's quality to the housing request more and more Gao, sprinkle building knothole crack now hurl tell a little bit hot, is also an engineering of graveness concealed suffer from. This text synopsis analysis sprinkle the building plank become of crack now because of, and put forward prevention and cure measure.
【Key words】Several residence;Sprinkle building plank now;Crack;Become because of;Prevention and cure
随着城市住宅建设步伐的加快,不少住宅小区相继建成,许多住户陆续搬进新居,他们对住房的质量要求越来越高,尤其对一些现浇楼板出现的裂缝情况非常关注,担心这些裂缝最终会引发不安全事故,而纷纷向建筑质量监督部门投诉。 如某市一开发商共建6层楼住宅16幢,建筑面积约10万平方米,砖混结构,初装修,一梯二户用砖墙分隔,每层设有圈梁同楼板整浇,板厚100mm,混凝土标号为C20,房屋长约80-90m之间,不设伸缩缝,底层为2.2m车库层,基础采用C20钢筋笼灌注桩。该小区于2003年10月完工,竣工验收时,未发现明显裂缝,在住户装修时,发现楼板有裂缝出现,故联名向质量监督部门投诉,经实地踏看,16幢房屋均存在深浅不一的裂缝。裂缝宽度在0.2mm-0.4mm之间,裂缝位置绝大多数处在板四角,朝阳处更为明显。于是,质监部门组织有关单位,首先对房屋沉降量和倾斜度进行复查,结果都在允许范围内,再查看施工图纸也符合有关规范要求。
1. 裂缝的主要原因有以下几点:
1.1 引起现浇板裂缝的主要原因是混凝土的收缩,因为混凝土在自然硬化过程中,由于水份不断蒸发,而体积渐渐收缩,但板四周受支座的约束,不能自由伸缩,所以当混凝土的收缩所引起现浇板的约束应力超过一定限度时,势必引发现浇板开裂。而且裂缝部位多发生在应力比较集中的地方——板角处,却与墙阴角线相垂直。
1.2 现浇板上过早施工,加荷引起的裂缝。《混凝土结构工程施工质量验收规范》规定,混凝土强度达到1.2N/mm2前,不得在其上踩踏或安装模板及支架。但开发商为了抢时间,赶进度,在刚浇好的现浇板上或混凝土尚处在初凝和终凝阶段,就任意踩踏,搬运材料,集中堆放砖块、砂浆、模板等。过早的加荷,人为地造成了现浇板裂缝。
1.3 温度变化引起的裂缝。大家知道,水泥在常温下具有凝结硬化快,水化热大等特点,尤其在夏天,混凝土浇筑后,水化热释放量大,混凝土在高温下,得不到及时浇水养护,而失水收缩,使混凝土发生干裂,最终导致开裂。调查中发现,居多板角裂缝都处在遭受太阳直接曝晒的朝阳面。
1.4 房屋过长未设置必要的伸缩缝,也是导致裂缝的原因。开发商为了节省土地,往往不顾及房屋长度,使房屋整体过长,也不设置伸缩缝,由于缺少必要的伸缩缝,当房屋的自由伸缩度达到或超过应设置伸缩缝要求的间距时,也会出现裂缝。
1.5 板负筋下沉产生的裂缝。在施工过程中,由于施工人员野蛮操作,任意踩踏钢筋,致使负筋下陷,保护层过大,减少了板截面的有效高度,使板的承载能力达不到设计的要求,从而导致板裂缝的产生。
2. 如何防治现浇板板裂缝的产生
根据多年的施工经验,提供以下一些防治措施,可供参考:
2.1 认真做好现浇板养护工作,是保证混凝土强度、防治裂缝产生的重要环节之一。规范规定,常温下混凝土浇筑后12小时内,必须覆盖保温养护,普通水泥不少于7天,如果忽视对混凝土的浇水养护,一方面会降低混凝土强度,另一方面会使混凝土在硬化过程中来不及补充水分,因而大量缺水而产生裂缝。所以做好混凝土的浇水养护,既可减少温度产生的裂缝,也可降低混凝土收缩而产生的裂缝。
2.2 现浇板上不要过早上人、堆料、施荷加载,因混凝土浇筑后要有一个硬化过程,才会有强度;在这个过程中,应对混凝土加以保养,不能对混凝土施加任何外力。如果在混凝土尚未有一定强度的情况下,在其上面集中堆放建筑材料或支模立撑,这样带给现浇板的不是强度,而是更多的裂缝。因此,必须做到在混凝土强度达到1.2N/mm2以后,才允许在其上踩踏或安装模板及支架。
2.3 严格控制板面负筋保护层厚度。现浇板负筋按设计要求都放在板上面,有梁通过或隔断时一般放置在梁钢筋上面或与梁钢筋绑扎在一起。为了控制好负筋保护层厚度,必须采用Φ10-Φ14的钢筋马凳,纵横间距800mm左右来固定负筋的位置,并用电焊把马凳与负筋焊牢,使马凳在混凝土浇筑过程中不移位,保证负筋不下沉,从而有效控制负筋保护层的厚度,不使板负筋保护层过厚而产生裂缝。
2.4 严格控制好砂、石粒径及含泥量。现浇板应选用中粗砂,粒径在0.25-0.5mm之间的石子,砂石含泥量均不得超过1%。如砂、石粒径过细过小,含泥量过大,都会降低混凝土强度,最终会使混凝土产生裂缝。
2.5 在板四角配置一定数量的角筋,即辐射筋。针对现浇板裂缝多发生在板角这一现象,在板角四周增设Φ8@200mm,长度为1800mm左右的辐射筋,以此来满足板角应力的需要,使现浇板产生裂缝的应力作用范围与辐射筋相一致,从而有效地改观和控制裂缝的产生。
[文章编号]1006-7619(2011)03-16-217
【关键词】多层住宅;现浇楼板;裂缝;成因;防治
Shallow talk to sprinkle building plank crack now of become because of with prevention and cure
Zhang Zi-hua
(Fushun zhongyu construction(group) limited liability company Fushun Liaoning 113000)
【Abstract】Along with town house construction step of speed, the inhabitant's quality to the housing request more and more Gao, sprinkle building knothole crack now hurl tell a little bit hot, is also an engineering of graveness concealed suffer from. This text synopsis analysis sprinkle the building plank become of crack now because of, and put forward prevention and cure measure.
【Key words】Several residence;Sprinkle building plank now;Crack;Become because of;Prevention and cure
随着城市住宅建设步伐的加快,不少住宅小区相继建成,许多住户陆续搬进新居,他们对住房的质量要求越来越高,尤其对一些现浇楼板出现的裂缝情况非常关注,担心这些裂缝最终会引发不安全事故,而纷纷向建筑质量监督部门投诉。 如某市一开发商共建6层楼住宅16幢,建筑面积约10万平方米,砖混结构,初装修,一梯二户用砖墙分隔,每层设有圈梁同楼板整浇,板厚100mm,混凝土标号为C20,房屋长约80-90m之间,不设伸缩缝,底层为2.2m车库层,基础采用C20钢筋笼灌注桩。该小区于2003年10月完工,竣工验收时,未发现明显裂缝,在住户装修时,发现楼板有裂缝出现,故联名向质量监督部门投诉,经实地踏看,16幢房屋均存在深浅不一的裂缝。裂缝宽度在0.2mm-0.4mm之间,裂缝位置绝大多数处在板四角,朝阳处更为明显。于是,质监部门组织有关单位,首先对房屋沉降量和倾斜度进行复查,结果都在允许范围内,再查看施工图纸也符合有关规范要求。
1. 裂缝的主要原因有以下几点:
1.1 引起现浇板裂缝的主要原因是混凝土的收缩,因为混凝土在自然硬化过程中,由于水份不断蒸发,而体积渐渐收缩,但板四周受支座的约束,不能自由伸缩,所以当混凝土的收缩所引起现浇板的约束应力超过一定限度时,势必引发现浇板开裂。而且裂缝部位多发生在应力比较集中的地方——板角处,却与墙阴角线相垂直。
1.2 现浇板上过早施工,加荷引起的裂缝。《混凝土结构工程施工质量验收规范》规定,混凝土强度达到1.2N/mm2前,不得在其上踩踏或安装模板及支架。但开发商为了抢时间,赶进度,在刚浇好的现浇板上或混凝土尚处在初凝和终凝阶段,就任意踩踏,搬运材料,集中堆放砖块、砂浆、模板等。过早的加荷,人为地造成了现浇板裂缝。
1.3 温度变化引起的裂缝。大家知道,水泥在常温下具有凝结硬化快,水化热大等特点,尤其在夏天,混凝土浇筑后,水化热释放量大,混凝土在高温下,得不到及时浇水养护,而失水收缩,使混凝土发生干裂,最终导致开裂。调查中发现,居多板角裂缝都处在遭受太阳直接曝晒的朝阳面。
1.4 房屋过长未设置必要的伸缩缝,也是导致裂缝的原因。开发商为了节省土地,往往不顾及房屋长度,使房屋整体过长,也不设置伸缩缝,由于缺少必要的伸缩缝,当房屋的自由伸缩度达到或超过应设置伸缩缝要求的间距时,也会出现裂缝。
1.5 板负筋下沉产生的裂缝。在施工过程中,由于施工人员野蛮操作,任意踩踏钢筋,致使负筋下陷,保护层过大,减少了板截面的有效高度,使板的承载能力达不到设计的要求,从而导致板裂缝的产生。
2. 如何防治现浇板板裂缝的产生
根据多年的施工经验,提供以下一些防治措施,可供参考:
2.1 认真做好现浇板养护工作,是保证混凝土强度、防治裂缝产生的重要环节之一。规范规定,常温下混凝土浇筑后12小时内,必须覆盖保温养护,普通水泥不少于7天,如果忽视对混凝土的浇水养护,一方面会降低混凝土强度,另一方面会使混凝土在硬化过程中来不及补充水分,因而大量缺水而产生裂缝。所以做好混凝土的浇水养护,既可减少温度产生的裂缝,也可降低混凝土收缩而产生的裂缝。
2.2 现浇板上不要过早上人、堆料、施荷加载,因混凝土浇筑后要有一个硬化过程,才会有强度;在这个过程中,应对混凝土加以保养,不能对混凝土施加任何外力。如果在混凝土尚未有一定强度的情况下,在其上面集中堆放建筑材料或支模立撑,这样带给现浇板的不是强度,而是更多的裂缝。因此,必须做到在混凝土强度达到1.2N/mm2以后,才允许在其上踩踏或安装模板及支架。
2.3 严格控制板面负筋保护层厚度。现浇板负筋按设计要求都放在板上面,有梁通过或隔断时一般放置在梁钢筋上面或与梁钢筋绑扎在一起。为了控制好负筋保护层厚度,必须采用Φ10-Φ14的钢筋马凳,纵横间距800mm左右来固定负筋的位置,并用电焊把马凳与负筋焊牢,使马凳在混凝土浇筑过程中不移位,保证负筋不下沉,从而有效控制负筋保护层的厚度,不使板负筋保护层过厚而产生裂缝。
2.4 严格控制好砂、石粒径及含泥量。现浇板应选用中粗砂,粒径在0.25-0.5mm之间的石子,砂石含泥量均不得超过1%。如砂、石粒径过细过小,含泥量过大,都会降低混凝土强度,最终会使混凝土产生裂缝。
2.5 在板四角配置一定数量的角筋,即辐射筋。针对现浇板裂缝多发生在板角这一现象,在板角四周增设Φ8@200mm,长度为1800mm左右的辐射筋,以此来满足板角应力的需要,使现浇板产生裂缝的应力作用范围与辐射筋相一致,从而有效地改观和控制裂缝的产生。
[文章编号]1006-7619(2011)03-16-217