厄瓜多尔CoCa Codo Sinclair水电站(简称CCS项目),是中水集团SINOHYDRO以EPC模式进行总承包的引水式电站,该电站共装机8台187.5 M W冲击式水轮发电机组,总装机容量1500MW。CCS项目是厄瓜多尔当前最重要的建设项目,也是该国引进中国融资和中国公司承建的典范性项目。C C S项目主要构成分5大部分:首部枢纽工程、
Ecuador CoCa Codo Sinclair Hydropower Station (referred to as CCS project) is a diversion-type hydropower plant contracted by SINOHYDRO of China Water Group under the EPC mode. The station has a total of 8 187.5 MW WPC units with a total installed capacity of 1,500 MW. The CCS project is currently the most important construction project in Ecuador and is also a model project in the country for the introduction of Chinese financing and the construction of Chinese companies. C C S project consists of five major components: the first hub project,