【摘 要】
:
过去东明县的修堤准备工作,往往只做了一般性的号召,土工队在上堤前临时整顿一下就涌上工地,准备工作很不充分,劳力不齐、工具不全,因此上堤后效率不高,民工收入不多,有的甚
论文部分内容阅读
过去东明县的修堤准备工作,往往只做了一般性的号召,土工队在上堤前临时整顿一下就涌上工地,准备工作很不充分,劳力不齐、工具不全,因此上堤后效率不高,民工收入不多,有的甚至不够伙食。为了彻底扭转这种现象,东明县在今年修堤前,充分重视了准备工作。首凭召开了扩
In the past, the repair work in Dongming County often only made a general call. The geotechnical team went to the site temporarily for temporary rectification before the embankment. The preparation work was inadequate, the labor was poor and the tools were not complete. Therefore, the efficiency after embankment Not high, migrant workers income is not much, some even not enough food. To completely reverse this phenomenon, Dongming County paid sufficient attention to the preparatory work before the renovation of this year. First held by the expansion
其他文献
请下载后查看,本文暂不支持在线获取查看简介。
Please download to view, this article does not support online access to view profile.
创业门路真是无奇不有,只要有需求,就有新行业可拓展。这不,提供这样的喜庆服务也能安身立业。
Business path is really amazing, as long as there is demand, there is a
2004年第46号经国务院批准,《中华人民共和国进出口税则》的税目、税率自2005年1月1日起进行调整(调整后的2005年版《中华人民共和国进出口税则》将通过中国财政经济出版社
本文说明了有杆抽油泵充满度测量的意义,介绍了测量原理和动态模拟实验装置,推导出了充满度计算公式,最后介绍了测量过程和实验结果。
This article explains the significance
请下载后查看,本文暂不支持在线获取查看简介。
Please download to view, this article does not support online access to view profile.
合理控制和设计峰值压力是高能气体压裂技术在油井使用的前提条件,准确地测试峰值压力是该技术研究的首要工作。铜柱测压不同于 P—t测试仪,以结构简单、方便直观被广泛用于高能
综合采用延迟焦化优化系统静态寻优值作为炉出口温度的设定基准值,在线实行急冷油程序控制和炉出口温度程序控制,开发了延迟焦化装置物料平衡的综合优化控制策略,并成功地应用在
介绍了我国天然气资源、生产、利用、管网及气价等方面的基本情况,并就如何加快发展我国天然气工业提出了若干对策建议:1.加大投资力度,增加探明储量;2.规范政府行为,改革天
用散文写历史,以自述表学术。这是我写作《戏缘:孙崇涛自述》的宗旨,也是我探索新写作模式的尝试。写作缘由如下——生当20世纪30年代末至21世纪今天70余年间的我,十分平庸。