论文部分内容阅读
2007年高速公路机电系统的建设进入改建年阶段,联网监控的建设也是在改建基础上的续建,因此存在和已建路段旧设备的衔接问题,在此本刊记者特集中业界专家的意见,以醒读者。
The construction of the highway electromechanical system in 2007 has entered the rebuilding phase. The construction of networked monitoring and control is also based on the rebuilding. Therefore, there exists the problem of connection with the old equipment of the existing road sections. In this reporter’s opinion, To awake readers.