论文部分内容阅读
火力发电厂输煤系统煤尘污染是一个老大难问题。为了贯彻国家2010 年消灭尘肺病及电力行业“九五”期间根治粉尘源的精神,西北电力设计院受电力规划设计总院委托,对原《火力发电厂输煤系统煤尘治理设计技术暂行规定》重新修编。但是要真正解决这一问题,除了从设计上抓起外,还必须加强管理体制,提高人员的素质和责任感,只有从我做起,人人爱厂如家,才能创造并巩固良好的文明生产环境。
Coal dust pollution in power plant coal-conveying systems is an old problem. In order to implement the national spirit of eradicating pneumoconiosis and the power source during the “Ninth Five-Year Plan” period of the power industry in 2010, the Northwest Electric Power Design Institute was commissioned by the Power Planning and Design Institute to intervene the original “Interim Provisions on the Design of Coal Dust Control Technology for Coal Handling Systems in Thermal Power Plants”. Revised. However, to truly solve this problem, in addition to grasping the design, we must also strengthen the management system and improve the quality and sense of responsibility of the personnel. Only from I start, everyone loves the factory, can create and consolidate a good civilized production environment. .