论文部分内容阅读
黄河小浪底水利枢纽工程已列入七届全国人大四次会议通过的《国民经济和社会发展十年规划和第八个五年计划纲要》,将于“八五”期间开工建设。这是党和国家对大江大河治理作出的一项重大决策,也是黄河沿岸人民渴盼的造福工程。小浪底水利枢纽工程位于黄河中、下游分界线的河南省孟津县与济源市交界的干流上,南距洛阳市约40km。大坝为斜心墙堆石坝,最大坝高154m,坝址以上控制流域面积69.4km~2,占黄河流域总面积的92.3%,总库客126.5亿m~2,长期有效库容可保持在51
The project of “Xiaolangdi Hydro-junction Project” of the Yellow River has been listed in the “Outline of the 10th Five-Year Plan for National Economic and Social Development and the Eighth Five-Year Plan” adopted by the Fourth Session of the Seventh National People’s Congress and will start construction during the “1985”. This is a major decision made by the party and the state on the management of major rivers and rivers and also the project of prosperity which the people along the Yellow River are eagerly looking forward to. Xiaolangdi Water Control Project is located in the middle and lower reaches of the Yellow River divide between Mengjin County, Jiyuan City, Henan Province and the mainstream, south of Luoyang City, about 40km. The dam is an inclined core rockfill dam with a maximum dam height of 154m and an area of control basin of 69.4km ~ 2 above the dam site, accounting for 92.3% of the total area of the Yellow River basin with a total reservoir volume of 12.65 billion m ~ 2. The long-term effective reservoir capacity can be maintained at 51