论文部分内容阅读
神朔铁路万吨列车成功开通六年多来,累计开行万吨列车重车45033列、空车37384列,运输煤炭超3亿吨,创造了良好的经济效益。2008年5月8日,神朔铁路公司万吨实验列车,顺利从燕家塔车站开行至神池南车站,标志着神朔铁路万吨列车试验获得成功。万吨列车成功开行后,神朔铁路对机车同步装置进行技术升级,拓展机车重联方式,在开行2+2组合方式万吨列车的基础上,相继组织了2+0方式、1+1方式万吨空车和单元重车、C64、C70、C80空车万吨列车的牵引试
The Shenzhou-Shou Railway has successfully opened over 10,000 tons of trains for more than six years, accumulating 45033 trains of heavy-tonnage trains, 37,384 empty trains and over 300 million tons of coal transportation, thus creating good economic benefits. On May 8, 2008, Shen-yuan Railway Company 10,000-ton experimental train successfully departed from Yanjiatha Station to Shenchi South Station, marking the success of the 10,000-ton train of Shen-Shuo Railway. After the successful launch of the 10,000-ton train, the Shen-Shuo Railway upgraded the locomotive synchronization device and expanded the ways of locomotive reconnection. On the basis of the 2 + 2-way combination of 10,000-ton trains, 2 + 0 and 1 + 1 modes Ten thousand tons of empty cars and unit heavy vehicles, C64, C70, C80 empty train million tons of traction test