引黄济青输水河工程自沉沙池出口闸开始,沿途经山东省惠民、东营、潍坊、青岛等三市一地的博兴、广饶、寿光、寒亭、昌邑、高密、平度、胶州和即墨等九个县(市、区),至棘洪滩泵站提水入棘洪滩水库,全长252.845公里,其中新开河渠193.078公里,扩建原打渔张一干18.145公里,利用小清河分洪道子槽35.972公里和吴沟河5.65公里,衬砌河段总长度206.99公里,是“七五”期间的重点工程建设项目.1986年4月动工
Yellow River Jiqingchuang River project from the desilting pool outlet gate, along the way through the Shandong Province Huimin, Dongying, Weifang, Qingdao and other cities in one of the Boxing, Guangrao, Shouguang, Hanting, Changyi, Gaomi, Pingdu, Jiaozhou And Jimo and other nine counties (cities and districts), pumping water to the Jianhongtan pumping station into the spine Hongtan reservoir, a total length of 252.845 kilometers, of which 193.078 kilometers of open canal, the expansion of the original fishing Zhang a dry 18.145 kilometers, the use of Xiaoqing River Fen flood trough 35.972 Kilometers and 5.65 kilometers of Wu Gou River, lining the total length of 206.99 kilometers of the river, is the “seven five ” during the key construction projects started in April 1986