河北国华黄骅发电厂烟气脱硫工程为2×600MW机组的配套工程,该工程由国华荏原环境工程公司实施总承包,与主机组同时设计、同时施工,特别是2台脱硫装置与主机组实现了真正意义上的同步投运,在华北地区首次实现环保工程的“三同时”。由于采用正确的工程管理模式,对遇到的各种问题采取了恰当的对策,在工期不断提前条件下,仍能使工程施工质量优良。
Hebei Guohua Huanghua power plant flue gas desulfurization project for the 2 × 600MW unit supporting projects, the project by Guohua Ebara environmental engineering company to implement the general contracting, with the host unit at the same time design, construction, especially 2 desulfurization unit and the host unit In the true sense of the realization of the synchronization put into operation in North China for the first time to achieve environmental protection “three at the same time ”. Due to adopting the correct project management mode, we have taken proper countermeasures against the various problems encountered, and still can make the construction quality excellent under the conditions of continuous construction.