论文部分内容阅读
鸡西市钢铁公司选煤厂二车间1990年建成投产,采用跳汰浮选工艺,主洗原矿液经捞坑溢流后进人浮选机回收精泥。为提高精煤产率,1994年初又配套建成再洗车间。二车间投产以来,发现捞坑使用效率不高,即捞坑的有效煤泥沉淀面积只有以斗提机尾部为中心,半径1.sin以内的范围。
Jixi Iron and Steel Company coal preparation plant two workshops completed and put into operation in 1990, the use of jigging the flotation process, the main crude ore ore by flooding pit overflow into the flotation machine recovery of refined mud. In order to improve the yield of clean coal, another auxiliary workshop was built in early 1994. Since the workshop was put into operation, it is found that the utilization efficiency of the fishing pit is not high, that is, the effective slime sedimentation area of the fishing pit is only 1 with the tail of the bucket elevator as the center. The range of sin.