论文部分内容阅读
石堡川水库兴建于1969年,1975年建成,惠及澄城、白水两县15个乡镇2万hm2良田。水库总库容6220m2,设干渠一条,长39km;支渠8条,分支渠12条,总长215km;斗渠397条,总长430km。水库投运27年来,渠道累计引水6亿m3,灌溉面积22万hm2次,灌区粮经比例由9∶1转变到4∶6,农民人均年纯收入由
Stone Fort reservoir was built in 1969, built in 1975, benefiting Chengcheng, Baishui two counties 15 towns and 20,000 hm2 fertile land. Reservoir total storage capacity of 6220m2, set a trunk canal, 39km long; branch canal 8, branch canal 12, a total length of 215km; bucket canal 397, total length 430km. In the 27 years since the reservoir was put into operation, the channel has accumulated a total of 600 million m3 of water and irrigated an area of 220,000 hm2. The proportion of grain and grain in the irrigation area has changed from 9: 1 to 4: 6. The per capita annual net income of farmers