某住宅小区六号楼新建工程,是一座三单元六层楼砖混结构房屋,总建筑面积为3000m~2。楼面板全部采用标准设计(辽G 101、KB1、33 3)预制钢筋混凝土空心板,于1981年5月动工,主体工程当年施工完毕。但后来发现,该楼三层以上各层楼面板配筋不够长,搁置在墙体上楼板端部没有搭接钢筋。经现场检查有80%不合格。其中有的钢筋不符合设计
The new construction of the sixth building of a residential community is a three-unit, six-story, brick-concrete structure with a total construction area of 3,000 m2. The floor panels are all made of standard design (Liao G101, KB1, 33 3) prefabricated reinforced concrete hollow slabs, which were started in May 1981. The construction of the main works was completed in the year. However, it was later discovered that there were not enough reinforcements on each floor of the floor above the three floors of the building, and that there were no laps on the end of the floor resting on the wall. 80% failed on site inspection. Some of the steel bars do not meet the design