一、运河庄台工程概况运河庄台位于南四湖的微山湖中,在微山县彭口闸乡潘渡河口,是为解决运河、猛进两个大队1500余人的居住安全而兴建的.庄台台面设计高程37.80m(废黄河口基面),东西长364m,南北宽166m,土方工程量总计60余万立方米.湖面正常水位32.5~32.6m,最低枯水位31.5m,湖底高程在31.1~31.3m之间,庄台区湖底高程在29.64~31.34m之间.湖底表面有0.4~0.6m厚的淤泥层,以下为3.5m深的软塑、可塑性粘土、粉质粘土,部分含少量贝壳、草根、细砂及微量的砂礓石.土质粘性较大,胶结性较好,在疏浚土质分类中略高于Ⅲ类土.
First, the Canal Mansions Project Overview Canal Zhuang Tai Nansi Lake in Weishan Lake, Weishan Peng Pengzha Township Pan Du estuary, is to solve the canal, Mengjin two brigade more than 1,500 people living safety and construction. Zhuangtai mesa design elevation 37.80m (spent Yellow River Estuary base), east-west length 364m, north-south width of 166m, a total of more than 600,000 cubic meters of earthworks. The lake level of 32.5 ~ 32.6m, the lowest water level 31.5m, 31.1 ~ 31.3m, Zhuangtai Lake bottom elevation of 29.64 ~ 31.34m between the bottom of the lake 0.4 ~ 0.6m thick silt layer, the following 3.5m deep soft plastic, plastic clay, silty clay, part of the containing A small amount of shell, grass roots, fine sand and traces of sand and gravel.Good clay viscosity, good cementing, soil classification in the slightly higher than the class III soil.