【摘 要】
:
藏东地区地处横断山脉,平均海拔3500m以上。长期以来,很多小水电站不能正常运行、提前报废的问题十分突出。藏东小水电“短寿”的主要原因是:①站址选择不理想:首先,横断山脉
【机 构】
:
重庆市水利电力职业技术学院,重庆市发展和改革委员会,重庆大学,
论文部分内容阅读
藏东地区地处横断山脉,平均海拔3500m以上。长期以来,很多小水电站不能正常运行、提前报废的问题十分突出。藏东小水电“短寿”的主要原因是:①站址选择不理想:首先,横断山脉西部三江弧形构造南段区域的地质条件十分复杂,地质灾害频率高,水土流失严重,选择理想站址很困难;其次,
The eastern Tibet is located in the Hengduan Mountains, with an average altitude of over 3500m. For a long time, many small hydropower stations can not operate normally and the problem of early retirement is outstanding. The main reasons for the “short life” of Tibet’s small hydropower are as follows: Firstly, the geological conditions in the southern section of the Sanjiang arc structure in the western part of the Hengduan Mountains are very complicated. The frequency of geological disasters is high and soil erosion is serious. Select the ideal station Site is very difficult; Second,
其他文献
Sinopec Jiujiang Petrochemical Co.,Ltd.conducted intermediate handing overthe 900 000 t/a gasoline hydrogenation facility on January 15th.The RMB167 million pr
【正】 Sinopec Anqing Petrochemical Co.,Ltd.,a subsidiary of Sinopec Corp.,started expansionof the refining and petrochemical integrated complex in Anqing of An
【正】 After PetroChina Co., Ltd.having obtained the approvalsby the Chinese and Canadian governments in respectof the acquisition of certain oil sands assets f
Taiyuan Petrochemical Industrial Trade Co.,Ltd.will build a lubricant oil project in TianjinNangang Industrial Zone,TEDA (Tianjin EconomicTechnological Develop
中国海洋石油总公司成立于1982年,28年来在国家只给政策,不给资金的情况下,目前已经快速成长为中国最大海上油气生产商。截止到09年底,我们总资产在整个国企里面排第七位,销
最近,结合自身工作和油田生产实际,深入学习了“两论”(毛泽东《矛盾论》和《实践论》),通过学习,取得了几点认识。问题的存在是绝对的,问题的发现和解决是相对的问题即是事
As economies around the globe haveadopted various measures to deal with theglobal economic crisis in 2009, the sign ofeconomic recovery has occurred.Still, itt
Sinopec Chongqing Petroleum Branch was officially formed on January 27th toensure energy supply in the Chongqing market.The new company will comrmt to sales of
China National Offshore Oil Corporation(CNOOC) started construction of Zhuhaideepwater engineering base on December28th,2009,signaling that the company willmar
东平湖滞洪区修筑时未能按水库挡水土坝要求进行勘探、设计和施工,导致坝身质量较差,基础未经处理,抗渗能力差,渗水严重。本文在分析研究东平湖西围坝工程地质条件的基础上,