【摘 要】
:
东平湖滞洪区修筑时未能按水库挡水土坝要求进行勘探、设计和施工,导致坝身质量较差,基础未经处理,抗渗能力差,渗水严重。本文在分析研究东平湖西围坝工程地质条件的基础上,
【机 构】
:
山东黄河勘测设计研究院,滨州市黄河河务局,
论文部分内容阅读
东平湖滞洪区修筑时未能按水库挡水土坝要求进行勘探、设计和施工,导致坝身质量较差,基础未经处理,抗渗能力差,渗水严重。本文在分析研究东平湖西围坝工程地质条件的基础上,对加固方案进行了探讨和研究。
During the construction of the Dongping Lake detention basin, the exploration, design and construction failed to be carried out as required by the dam retaining dam, resulting in poor quality of the dam body, untreated foundation, poor impermeability and serious water seepage. Based on the analysis of the engineering geological conditions of the Xipingu dam in Dongping Lake, the reinforcement scheme is discussed and studied.
其他文献
执行的最高境界是高度自觉、自我执行。而要达到这一境界,必须注重加强企业精神的培育,依靠文化的力量形成强大的内动力。党的十七大发出了“兴起社会主义文化建设新高潮,全
Sinopec Jiujiang Petrochemical Co.,Ltd.conducted intermediate handing overthe 900 000 t/a gasoline hydrogenation facility on January 15th.The RMB167 million pr
【正】 Sinopec Anqing Petrochemical Co.,Ltd.,a subsidiary of Sinopec Corp.,started expansionof the refining and petrochemical integrated complex in Anqing of An
【正】 After PetroChina Co., Ltd.having obtained the approvalsby the Chinese and Canadian governments in respectof the acquisition of certain oil sands assets f
Taiyuan Petrochemical Industrial Trade Co.,Ltd.will build a lubricant oil project in TianjinNangang Industrial Zone,TEDA (Tianjin EconomicTechnological Develop
中国海洋石油总公司成立于1982年,28年来在国家只给政策,不给资金的情况下,目前已经快速成长为中国最大海上油气生产商。截止到09年底,我们总资产在整个国企里面排第七位,销
最近,结合自身工作和油田生产实际,深入学习了“两论”(毛泽东《矛盾论》和《实践论》),通过学习,取得了几点认识。问题的存在是绝对的,问题的发现和解决是相对的问题即是事
As economies around the globe haveadopted various measures to deal with theglobal economic crisis in 2009, the sign ofeconomic recovery has occurred.Still, itt
Sinopec Chongqing Petroleum Branch was officially formed on January 27th toensure energy supply in the Chongqing market.The new company will comrmt to sales of
China National Offshore Oil Corporation(CNOOC) started construction of Zhuhaideepwater engineering base on December28th,2009,signaling that the company willmar