在水利建设中,尤其在修筑堤防方面,土方工程的工作量是很巨大的,而以人力挖挑的施工方法为最多,且最普遍。因此,土工定额是很重要的,合理的土工定额,可以为恰当的调配劳力,合理的计算工资,确切的布置工场,适时的供应设备等,提供可靠的依据。但是由於定额工作开展得尚不久,资料积累有限,工作经验缺乏,因而使定额本身的某些部份,尚存在着一些缺陷,以当前人力挖挑土工定额曲线的形式来说,就是一例。土工定额曲线的形式,表现在连距的变化而定
In water conservancy construction, especially in the construction of embankments, the workload of earthworks is enormous, and the manpower to dig the most construction methods, and the most common. Therefore, the geotechnical quota is very important. A reasonable geotechnical quota can provide a reliable basis for the proper deployment of labor, reasonable wage calculation, proper site layout and timely supply of equipment. However, since the quota work has not been carried out yet for a long time, the information is limited and the work experience is lacking, some parts of the quota itself still have some shortcomings. This is an example in the form of current manpower digging out the geotechnical quota curve. Geotechnical quotas in the form of performance in the continuous pitch changes