水利工程施工阶段,往往要对原工程设计文件、施工方案等进行必要的变更。这种变更可能来自于设计单位、项目监理单位、承包商等建设主体。但无论来自哪个主体,通常都会对建设项目的质量、进度和投资等监理目标的控制带来一定的影响。监理工程师要想更好地控制监理目标,就要结合工程实际,按照监理合同对三控目标的要求及不同建设主体提出的工程变更采取一些有针对性的措施,做好工程变更前的研究分析和审核确认工作,严格按有关程序对工程变更进行积极主动、行之有效的动态管理,以减少工程变更对监理目标的影响。
Hydraulic engineering construction phase, often the original engineering design documents, construction programs, etc. necessary changes. Such changes may come from the design units, project supervision units, contractors and other construction entities. However, no matter which subject it comes from, it will usually exert some influence on the control over the supervision objectives of construction projects such as quality, progress and investment. In order to supervise the supervision target better, supervision engineers should take some targeted measures in accordance with the actual project, the requirements of the three control targets in accordance with the supervision contract and the engineering changes proposed by different construction entities, and do the research and analysis before the project is changed And review and confirm the work, in strict accordance with the relevant procedures for project changes proactive and effective dynamic management, in order to reduce the impact of project changes on the supervision objectives.