《汶川地震灾后通信基础设施重建规划》已于早些日子出台。规划期分为近3年(2008—2010年)和后5年(2011—2015年),以近3年为主,规划范围主要是四川省严重受灾地
“Reconstruction Plan for Post-Wenchuan Earthquake Earthquake Infrastructure” was introduced earlier. The planning period is divided into nearly three years (2008-2010) and the next five years (2011-2015), with nearly three years as the main planning area, mainly in Sichuan Province