论文部分内容阅读
由于扎戈尔抽水蓄能电站在复杂的地质和地形条件下施工 ,为保证其运行可靠性 ,及有效评估建筑物状态 ,制定了在施工与运行期间对建筑物的观测计划
Due to the construction of Zagor Pumped Storage Power Station under complicated geological and topographic conditions, in order to ensure its operational reliability and to effectively evaluate the status of the buildings, a plan for the observation of buildings during construction and operation