1987年12月21日,我市电业局SHW240—70/95型强制循环热水锅炉发生爆管事故,被迫停止运行。该炉自投入运行至事故发生仅仅五十天。一、锅炉自然概况:该炉由1987年9月出厂,额定供热量为2.8MW,额定出水温度为96℃,额定回水温度为70℃。水循环分为三段,第一段为水冷壁;第二段为第一对流管束;第三段为第二对流管束。其水流程如图1所示:注:4、8是上锅筒,在锅筒内装有隔板,
On December 21, 1987, the SHW240-70 / 95 forced circulation hot water boiler in our city electric power bureau burst pipe accident and was forced to stop running. The furnace was put into operation until the accident occurred only fifty days. First, the natural overview of the boiler: The furnace from the factory in September 1987, rated heating capacity of 2.8MW, rated outlet temperature of 96 ℃, rated return water temperature of 70 ℃. The water cycle is divided into three sections, the first section is the water wall, the second section is the first convection tube bundle, and the third section is the second convection tube bundle. The water flow shown in Figure 1: Note: 4,8 is on the drum, with a separator in the drum,