为保证悬臂浇筑连续梁合龙后的桥面线形满足要求,需要对桥梁施工过程实施有效监控。本文结合成绵乐客专跨三环路连续梁工程实践,对线形监测方法和控制措施进行了总结。
In order to ensure that the cantilever pouring of continuous girder bridge deck meets the requirements, the bridge construction process needs to be effectively monitored. Based on the practice of the Mianlele Passenger Dedicated Bridge across the Third Ring Road, this paper summarizes the linear monitoring methods and control measures.