论文部分内容阅读
为了适应坑道施工打仰孔,我队将北探厂生产的XJ—100型钻机进行了改装,经试验取得了初步效果。改装的XJ-100型钻机见附图。改装方法:将XJ-100型钻机机架去掉不用,改用上下两个托盘。上托盘用来固定钻机,下托盘固定75千瓦电机。上下两个托盘,由φ89两根顶杠支承,钻机的三角皮带的松紧度,由φ89顶杠移动下托盘进行调整。为了解决向上孔倒杆,防止钻具下滑,在孔口控装了一个联动式夹持器。
In order to adapt to the tunnel construction Yang Yang hole, the team will be the North Exploration Factory production XJ-100 drilling rig was modified, the initial results obtained by the test. Modified XJ-100 drilling rig see the photo. Modification method: remove the XJ-100-type rig rack without using the upper and lower two trays. The upper tray is used to fix the drilling rig and the lower tray to fix the 75 kW motor. Up and down the two pallets supported by the φ89 two top bar, rig tightness of the V-belt, φ89 top bar to move the lower tray to adjust. In order to solve the up hole down bar, to prevent the drill down, controlled in the mouth of a linkage holder.