论文部分内容阅读
自从党的十一届三中全会以来,我们遵循党中央的伟大战略部署,从我省国民经济发展的需要和我们自身力量出发,以“储备力量,打好基础,为后十年‘起飞’创造条件”为指导思想,本着积极、主动、超前的姿态,抓紧大中型水利、水电工程的前期工作。到1989年底止,共完成11条河流的水力资源开发规划报告,流域面积共33618平方公里,共可开发47座梯级电站,总库容44.61亿立方米,可装机143万千瓦。完成不同设计阶段(包括可行性研究报告和初步设计)前期项目26项。其
Since the Third Plenary Session of the 11th CPC Central Committee, following the great strategic plan of the party Central Committee and from the needs of the development of our national economy and our own strength, we have “laid the foundation for reserve forces, took off for the next decade” Create conditions "as the guiding ideology, in a positive, proactive, advanced attitude, pay close attention to large and medium-sized water conservancy, hydropower project preparatory work. By the end of 1989, a total of 11 rivers and rivers of water resources development planning report, a total area of 33618 square kilometers basin, a total of 47 cascade hydropower stations can be developed, with a total storage capacity of 4.46 billion cubic meters, can be installed 1.43 million-kilowatt. Completed 26 preliminary projects in different stages of design (including feasibility study and preliminary design). its