●三峡工程设计安装26台容量为70万千瓦的机组,是全球最大的跨世纪工程 大江截流是世界水利史上截流综合难度最大的一次截流。三峡截流合龙时选定的设计流量为每秒1.4万至1.94万立方米,是迄今为止世界水电工程最大截流流量——巴西伊泰普工程截流流量的1.75倍,是国内最大截流流量——葛洲坝截流流量的2.9倍。三峡截流最大水深为60米,是世界水电工程最大的截流水深——美国达勒斯工程最大截流水深的1.3倍,比葛洲坝截流水深深40米。
● Design and installation of 26 units with a capacity of 700,000 kilowatts in the Three Gorges Project is the largest cross-century project in the world. River closure is the largest interception closure in the world’s water conservancy history. The closure of the Three Gorges selected design flow when the closure of 14,000 to 19,400 cubic meters per second, is by far the world’s largest hydropower project interception flow - the closure of Itaipu, Brazil, 1.75 times the flow rate is the largest flow interception - Gezhouba Closure of 2.9 times the flow. The maximum water depth of the closure of the Three Gorges Project is 60 meters, which is the largest water cut-off of the world’s hydropower project - 1.3 times the maximum closure water depth of the Dallas Project in the United States and 40 meters deeper than that of the Gezhouba Dam.