,Profit loss indicator: a novel maintenance indicator applied for integrated planning

来源 :Advances in Manufacturing | 被引量 : 0次 | 上传用户:qingmiannv
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
In production environment today,“silo thinking”is a challenge where controlling an asset associated with several disciplines and departments can lead to a suboptimal result.This requires a more integrated approach with an integrated planning(IPL)framework.In this framework novel maintenance key performance indicators(KPIs)are needed.The purpose of this article is to develop the novel maintenance KPI profit loss indicator(PLI).This indicator is based on measuring both on the“hidden factory”and waste in production,presenting it as a financial measure.The notion“hidden factory”is used as a metaphor for measuring the time losses in industry through the maintenance KPI overall equipment effectiveness(OEE).This indicator divides the time losses into availability losses,performance losses and quality losses.In addition,a financial measure for waste based on literature from Toyota production system(TPS)and waste treatment and disposal is also included in PLL Through a case study in the saw mill industry PLI is demonstrated and evaluated.It is expected that this indicator will be demonstrated in several industry branches in the future. In production environment today, “silo thinking ” is a challenge where controlling an asset is associated with several disciplines and departments can lead to a suboptimal result.This requires a more integrated approach with an integrated planning (IPL) framework. In this framework novel maintenance key performance indicators (KPIs) are needed. The purpose of this article is to develop the novel maintenance KPI profit loss indicator (PLI). This indicator is based on measuring both on the “hidden factory” and waste in production, presenting it as a financial measure. notion “hidden factory ” is used as a metaphor for measuring the time losses in industry through the maintenance KPI overall equipment effectiveness (OEE) .This indicator divides the time losses into availability losses, performance losses and quality losses.In addition, a financial measure for waste based on literature from Toyota production system (TPS) and waste treatment and disposal is also included in PLL Through a case study in the s aw mill industry PLI is demonstrated and evaluated. It is expected that this indicator will be demonstrated in several industry branches in the future.
其他文献
利用茎尖培养脱毒苗生产无病种薯,是防止马铃薯退化并提高其产量的重要措施.过去通过茎尖培养获得马铃薯脱毒苗,一般需要3年.1985—1986年,我们改进脱毒工作各环节,用一年多
并购是一种企业扩大规模,以求迅速达到获取市场、产品及技术的目的,同时具有较低风险的策略方案,现今世界著名的500强企业大多是由资本并购重组发展而来,这种策略方案资本市场优
对蔗茎含糖量低,纤维分高的晋江割手密、崖城割手密(Saccharum spontaneum L.),崖城斑茅(S.arundinaceum Retz.)三个野生种,含糖量中等的松溪竹蔗(S.sinense Roxb.)、春尼(S.
This paper presents an approach for determining the optimal cutting condition for milling thin-walled elements with complex shapes.The approach is based on the
High-speed micromilling (spindle speeds 100 000 r/min) can create complex three-dimensional microfeatures in difficult-to-machine materials.The micromachined su
什么事情都有一个“度”的问题。所谓“度”,是指任何事物的量都有一个界限,一旦越过,性质就会起变化。一张报纸天天同读者见面,影响着读者的思想、工作、学习、生活,宣传内
邓小平同志在党的全国代表会议上号召各级干部要学习马克思主义理论,在新闻战线产生了强烈的反响。许多同志认为,这对于我们在新的形势下坚持新闻工作的正确方向,提高新闻宣
实施农业科技进村入户,建立农业科技特派员制度,把农业科学技术直接送到农民手中,我们不禁为之叫好!实施农业科技进村入户,建立特派员制度,是落实科学发展观,建立和谐社会,贯
新兴的市场经济国家摆脱贫困后,经济都会有一个迅猛发展的时期,之后处于中等收入阶段时,由于经济增长过快积累的矛盾就会不断凸显,经济、社会、政治变化非常敏感,稍有不慎就