论文部分内容阅读
介绍了模壳早拆体系的施工工艺 ,对其构造、安装和拆除进行了描述 ,并将该体系与常规支撑体系进行了技术经济比较。
The construction process of the mold shell early demolition system was introduced. Its structure, installation and demolition were described, and the system and the conventional support system were compared technically and economically.