【摘 要】
:
龚咀水电站位于大渡河中游,为该河的第一期开发工程。水电站大坝为混凝土重力坝,最大坝高85m,总装机容量700MW。龚嘴水电站采用左岸明渠全年导流方案,河道截流采用立堵抛石
论文部分内容阅读
龚咀水电站位于大渡河中游,为该河的第一期开发工程。水电站大坝为混凝土重力坝,最大坝高85m,总装机容量700MW。龚嘴水电站采用左岸明渠全年导流方案,河道截流采用立堵抛石截流方式,其导截流布置见图1.现将该工程导截流模型试验及原型观测结果做一介绍,供有关同志参考。
Gongzui Hydropower Station is located in the middle reaches of Dadu River, the first phase of the river development project. The dam is a concrete gravity dam with a maximum dam height of 85m and a total installed capacity of 700MW. The Gongzui Hydropower Station adopts the diversion scheme of the left bank open channel for the whole year, and the river closure adopts the plugging and plugging closure method, and its diversion and river closure layout is shown in Figure 1. Now, the pilot-scale closure model test and prototype observation results are introduced for reference by the relevant comrades .
其他文献
水利电力部水利水电规划设计院于1986年元月10日至16日在湖南省长沙市中南勘测设计院召开了入库洪水及库区洪水演进专题论论会。参加会议的有16个有关单位的51名代表。提交
微机调速器是一种带有微处理机的水轮机调速器,适用于中小型水轮机调节,其主要功能是对电网系统的频率调整和负荷调整。另外,还可调整桨叶转角进行程序控制,如图1所示为调速
树木生长到一定高度阶段,顶部叶片会受到水分运输阻力的影响,表现为叶片水分亏缺,进而引发其他生理特性的变化.本研究比较了阔叶红松林3种高大乔木(蒙古栎Quercus mongolica
当代是一个高效率、高节奏的竞争时代,世界经济一体化趋势逐步加强,也使得各国之间的联系日益密切,机械工业是国家的基础工业,是国民经济发展的重要组成部门之一。面对与日俱
现在平面设计试图突破常规用图形、图像等非语言形式的形式将信息传达给世人,除了起到视觉上的装饰和美化外更是迎合了人类文明需要的发展趋势。在国际市场快步走向阶级一体
安全用电是机电专业的一门重要专业课程,也是学生必须学习的一种有重要意义的专业技术。这门课程的理论性和实践性都较强,联系的知识面较广,而且有一定的抽象性。由于学生在
近年来,世界各国兴建了大量不同类型的水坝。在坝高、筑坝材料、水库库容及水电站装机容量等方面,都是创纪录的。根据世界各国1934年登记注册的272座超大型大坝资料,可以得
在汽车运用与维修专业进行理论教学和实训教学中应用德国项目教学法和行动导向法,使教师的教学目的更明确,教学效果更突出;课堂教学中真正体现了以学生为主体,教师为主导;在
The early Jurassic intrusive complex is chiefly made of monzodioritic porphyry in northern Anhui and northern Jiangsu, which emplaced in 191 Ma. The intrusive c
据我们的研究、分析计算和在实际管理匕的应用,水库的防洪和兴利库容一般是可以共用的,特别是设计有闸门控制的中小型水库,对其防洪和兴利库容进行共用,效果是显著的。
Acc