论文部分内容阅读
漳卫南运河砌石护岸工程在“96.8”洪水中造成损毁原因,主要是砌石护坡的工程结构不合理及固基措施不力。水毁修复工程增加了无纺布垫层,并采取了纵、横向相结合固基措施,同时制定了严格的施工技术规范并在施工中加以实行。
Zhangweinan canal masonry revetment project “96.8” flood damage caused by the main masonry slope protection of the unreasonable structure of the project and the solid-based measures ineffective. Water damage repair project to increase the non-woven mat, and take the vertical and horizontal combination of solid-based measures, and developed a strict construction specifications and implemented in the construction.