苏丹麦洛维大坝工程号称苏丹的三峡工程,包含有了溢流坝、非溢流坝、厂房坝段、粘土心墙坝、面板堆石坝及均质土坝等多种坝型。其中厂房坝段设置10条直径为8.5m的引水压力钢管、共10台混流式机组,由法国ALSTOM公司供货及安装。由于工程处于撒哈拉沙漠的边缘,气候为典型的沙漠干旱、高温气候,为避免可能的温度裂缝,德国咨询拉美尔公司设计了大量温度抗裂3D钢筋,加之蜗壳机窝本就十分复杂的各种埋件、钢筋及阴角部位,使得该部位空间狭小、二期砼浇筑十分困难。本文将根据工程特点重点介绍厂房二期砼浇筑,以供类似工程施工参考。
The Sulu Merowei Dam Project The Three Gorges Project, known as Sudan, includes a variety of dam types including spillway dam, non-overflow dam, factory dam section, clay core wall dam, face rockfill dam and homogeneous earth dam. Among them, 10 aqueduct pipes with a diameter of 8.5m were set up in the dam section of the plant. A total of 10 Francis units were supplied and installed by France’s ALSTOM Company. As the project is located in the Sahara desert edge, the climate is a typical desert drought, high temperature climate, in order to avoid possible temperature cracks, the German consultants La Mer, the design of a large number of temperature crack 3D steel, combined with the volute is very complex Species embedded parts, steel and Yin corner of the site, making the site space is small, the second phase of concrete pouring is very difficult. This article will focus on the project according to the characteristics of the second phase of concrete pouring plant for reference for similar projects.