黄河浪店水源工程位于黄河小北干流中段左岸,是为解决夹马口、小樊、尊村三大泵站长期脱流的问题而兴建的。在黄河小北干流的荡性河道上兴建无坝取水工程,取水位置选择是工程成败的关键。为了提高黄河着流点可靠率和引水保证率,本文将几种组合方案进行综合比较和优选,以适应河势的变化,很好地解决三大泵站的水源短缺问题。
The Yellow River Langdian Water Source Project is located on the left bank of the middle section of the Xiaobeijiang River in the Yellow River and is built to solve the problem of long-term off-flow of the three pumping stations of Jiamakou, Xiaofan and Zuncun. Construction of non-dam water intake project on the waterways of the small north main stream of the Yellow River is the key to the project’s success or failure. In order to improve the reliability and diversion rate of the Yellow River, this paper compares and optimizes several combination schemes to adapt to the change of river regime and solves the problem of water shortage in the three major pumping stations.