论文部分内容阅读
国产大型客机C919通过了首飞技术评审,标志着C919大型客机向首飞目标又迈出了坚实的一步。为确保C919大型客机首飞成功,对其设计结果、制造状态、试飞和客服工程准备工作进行确认,中国商用飞机有限责任公司组织召开了C919大型客机首飞技术评审会。评审委员会分为总体技术、机体结构、飞控机械、航电电气、推进燃油、制造和综合7个组,对承
The domestically-made large-scale passenger aircraft C919 passed the first flight technical review, marking the C919 large-scale passenger plane to take another solid step toward the first flight goal. In order to ensure the success of the first flight of the C919 large passenger aircraft, its design results, manufacturing status, test flights, and customer service engineering preparations were confirmed. China Commercial Aircraft Co., Ltd. organized the first flight technical review meeting for the C919 large passenger aircraft. The review committee is divided into seven groups: overall technology, body structure, flight control machinery, avionics, fuel advancement, manufacturing and integration.