对望亭电厂 1 4号机组轴系安装过程中发生扬度变化的原因及扬度变化的全过程进行了分析和总结 ,采取相应措施后得到顺利解决。为同类型机组的改造提供了借鉴
The reason of the change of the lift and the whole process of the change of the lift during the installation of the Shaft System of No.1 4 unit in Wangting Power Plant are analyzed and summarized, and the corresponding measures are taken to get a smooth solution. For the same type of units to provide a reference for the transformation