一、渭河灾后重建水毁修复任 务全面完成。争取中央投资4.3亿元, 在7月份主汛期到来之前,全面完成了 91个单项工程的修复重建任务,渭河下 游干流堤防防洪能力全面恢复,重点堤 段防洪能力达到了50年一遇的标准。 二、省内南水北调工程进展顺 利。“引乾济石”调水工程秦岭输水隧 洞全线贯通,建设任务完成过半;“引 红济石”调水“四通一平”施工准备工 作全面完成,部分工程开始动工建设; “引汉济渭”调水前期工作力度加大, 一期工程项目建议书编制进展顺利。同 时,在建的安康黄石滩水库、延安红庄 调蓄水库主体工程建成;渭南涧峪水 库、榆林李家梁水库实现了节点建设目 标。
First, the Weihe River flood reconstruction tasks completed after the disaster. For the central government’s investment of 430 million yuan, the task of restoration and reconstruction of 91 individual projects was fully completed before the main flood season began in July. The flood defensive capacity of the main embankments in the lower reaches of the Weihe River has been fully restored. The flood control capacity of key dike sections has reached the standard of 50 years. Second, the province’s South-North Water Transfer Project is progressing well. “Lead dry stone” “water diversion project Qinling water tunnel across the board, construction tasks completed more than half; ” red red stone “” water “four links a flat ” construction preparation completed fully, some projects started Construction; “lead Han Ji Wei ” early efforts to increase water transfer, a project proposal progressing well. At the same time, the well-being Huangshitan Reservoir under construction and the main reservoir project of Hongzhuang Reservoir in Yan’an are completed; the Jiangyu Reservoir in Weinan and the Lijialiang Reservoir in Yulin have achieved the goal of node construction.